Optim Series
University of Wollongong, Keiraville NSW
Who we teamed up with:
Richard Crookes Constructions and Bondclad Façades.
Project overview:
Designed, engineered and supplied out pre-rainscreen Optim series
framing to speed up the project.
The method of using pre-fixing galvanised sheet meant Richard Crookes
could close up the building as our framing was installed. This allowed
internal trades to begin and sped up the project as a whole.