Accent and Optim Series.
1 Bryant Drive Tuggerah.
Who we teamed up with:
North Construction & Building.
Project overview:
Frame-Tek designed, engineered and supplied our Optim Series floor
to floor wall system for this project.
It was used in lieu of conventional glazed curtain wall system and
sped up the construction process as it followed behind the floor
pours and allowed Norths to close up the building quickly.
Accent framing was designed, engineered and supplied into
the main support framing.