OPTIM SERIES

M5 West Connex Tunnel

Project details

Frame-Tek designed, engineered, and supplied our Optim Series framing to support the cladding on the sides of the entry ramps to the M5 WestConnex Tunnel. The system was engineered for rapid installation, minimising fixings to the supporting structure while fully complying with RMS specifications. Fabricated using our unique Z450 coated framework, the frames offer enhanced durability suited to the project environment.

TYPE

Infrastructure/Civil

LOCATION

M5 WestConnex Tunnel, Beverly Hills

SCOPE

Entry Ramp Façade Support

CLIENT

Australian Cladding Services.

GALLERY

TESTIMONIALS

RELATED PRODUCTS