Blacktown Hospital Redevelopment 1 & 2

Frame-Tek designed, engineered, and supplied our Off-Slab Optim Series framing system for the Blacktown Hospital redevelopment. The prefabricated pre-rain screen façade enabled the builder to close the building faster, allowing internal works to commence sooner and improving overall project efficiency.
Penrith Industrial Units

For the new warehouse development at Hickeys Lane, Frame-Tek provided a customised façade support solution, supplying Endura Series fascia trusses for the front-of-office elevations. Precision-designed and engineered to meet project specifications. The prefabricated system enabled faster, more efficient installation, reducing on-site labour and construction time, delivering both visual and operational advantages.
DFO Homebush

Frame-Tek delivered a tailored framing solution for the refurbishment of Homebush DFO for the box pop-out architectural feature. Designed to interface effortlessly with the existing structure, our system supported a fast-paced install in a busy, operational retail environment. Using precision-modulated framing, we engineered and supplied fully prefabricated modules that eliminated complex on-site construction. This allowed […]
Ballina High School

At Ballina High School, Frame-Tek delivered a customised solution using our Accent Series Feature Framing, developed for the project’s striking vertical sun hood fins. Designed and manufactured to complement the school’s modern architectural design, our system enhances both the visual appeal and practical shading performance of the building. Engineered for strength and longevity, this solution […]
Surry Hills Village

Frame-Tek was engaged to deliver a bespoke prefabricated framing solution for the external facade support and complex curved awnings at the Surry Hills Village Development. Our Optim Series Off-Slab Framing system was engineered to support key architectural and structural elements, including curved windows, brick slip facade, fire stair structures, and bulkhead framing— ensuring full alignment […]
Mariner’s Building

Frame-Tek was engaged to deliver a fast, efficient walling solution for the Mariners Building of Excellence. Our Optim Series floor-to-floor wall system was designed, engineered, and supplied as a high-performance alternative to conventional glazed curtain walls. Installed directly after floor pours, the system enabled Norths to rapidly enclose the structure, significantly accelerating the construction timeline. In addition […]