Prince of Wales Hospital – Nelune Comprehensive Cancer Centre (NCCC)

Frame‑Tek designed, engineered, and supplied the full external façade framing solution for the Prince of Wales Hospital Cancer Centre in partnership with Martifer Aluminium. Our pre‑rainscreened, insulated panels were delivered with all façade brackets pre‑fixed, enabling rapid installation on site. This prefabricated approach allowed the façade contractor to progress faster, helped the builder achieve an […]

M Park Stockland

Frame-Tek delivered bespoke prefabricated façade support solutions for a commercial project in collaboration with Australian Cladding Specialists. The system included prefabricated façade support frames designed to carry the brick slip finish around the ground level of the building. Engineered for precision and ease of installation, the Zenith Series replaced traditional structural steel with a lighter, […]

Gosford Hospital Redevelopment

Frame-Tek collaborated with Lendlease to deliver a tailored Calibre Series roof framing solution for Gosford Hospital. The light-structural prefabricated modules were designed for two-man lifts, making installation fast and manageable on a live healthcare site. Our system was engineered to coordinate with services, including rope loads and gutter support, and was robust enough to withstand […]

Concord Hospital

Frame-Tek partnered with Roberts Co. to deliver a custom-engineered Calibre Series prefabricated roof framing solution for the Concord Hospital redevelopment. The system was designed to support plant platforms and integrate roof battens and box gutter details, all coordinated with services and backed by certified shop drawings. Our flexible design approach allowed for prefabricated units to […]

Lismore Hospital

Frame-Tek was engaged by John Holland Group during the early construction phase when the original design began presenting significant constructability challenges. With construction already underway, our team was tasked with resolving issues that were hindering efficient and accurate buildability. Leveraging our integrated design and engineering expertise, Frame-Tek developed a custom off-slab framing solution that addressed […]

Blacktown Exercise, Sports & Technology Hub

Frame-Tek proudly contributed to the success of the Blacktown Exercise, Sports & Technology Hub(BEST) Project by delivering a custom designed and engineered façade support solution. Our Zenith Series Slab-to-Slab framing is supporting the heavy GRC (Glassfibre Reinforced Concrete) panels, our system provided a high-performance alternative to conventional heavy structural steel frameworks. By replacing the originally […]

St George Hospital

(IN PROGRESS) Frame-Tek is supplying a range of prefabricated façade support framing systems for multiple areas of the St George Hospital redevelopment. Our Optim Series off-slab framing is installed on the upper levels to support cladding, while our Zenith Series slab-to-slab framing is used on the lower levels to support the brick façade. In addition, […]

Station Road Data Centre

(IN PROGRESS) Frame-Tek collaborated with Taylor Construction to design, engineer, and supply our prefabricated Zenith Series slab-to-slab façade support system for one of the new Data Centres. The system provided reliable and efficient support for the external façade, while also meeting the structural and performance demands of this high-specification facility. In addition to the primary […]

BP Katoomba

Frame-Tek was engaged to deliver our prefabricated Endura Series fascia trusses for both the truck and car fuel canopies at BP Katoomba, ensuring full compliance with wind load specifications. Using riveted joints and uniform member sizing, the trusses were prefabricated with all connection holes pre-coordinated to align with the structural steel cleats—ensuring a smooth and […]

Aldi Salamander Bay

Frame-Tek provided our prefabricated Endura Series fascia trusses to support the façade on the awning at the ALDI store in Salamander Bay. This efficient framing solution helped reduce installation time and overall project costs, delivering measurable benefits for the client.